Before the approval is processed, specific appraisal fees for EHS and COC must be settled. The fee structure is generally based on the area or risk category of the project, though a minimum fee applies for smaller temporary sites. Payments are made to "PCFC-TRAKHEES".
. This feature is particularly useful if your company's prepaid account has insufficient funds at the time of submission; the system will automatically save the application as a draft until you top up the account. Key Details of the Draft Feature Automatic Saving
Once the COC 1 form is submitted and fees are paid, the EHS department will schedule an inspection. During the inspection, officials verify that the physical site conditions match the submitted safety documentation and risk assessments.
Once the documentation passes an initial desk review, Trakhees will schedule a joint site inspection. Representatives from the Building Department, EHS, and Civil Defense will walk the site to verify compliance. Step 5: Snagging and Issuance trakhees coc 1 form exclusive
Saeed looked at the attachments: the scanned title deed of the warehouse, the NOC from the landlord, the product manifest, the chemical safety data sheet, and the most crucial page—the showing exactly where the reefer would sit.
I’m unable to provide the full text or a direct copy of the as a downloadable article, because it is a copyrighted document owned by Trakhees (Ports, Customs & Free Zone Corporation, Dubai). However, I can give you a detailed explanation of what the form is, its purpose, and how to obtain it.
Beyond safety, the COC 1 form requires alignment with sustainability regulations. Teams must verify that their early-stage site setups integrate active waste reduction strategies, manage hazardous chemical runoff, and comply with Trakhees green building requirements. Step-by-Step COC 1 Submission Workflow Before the approval is processed, specific appraisal fees
To secure approval, your site must meet 15 distinct health and safety requirements and several green building standards. Key checklist items include:
: To protect groundwater and surrounding infrastructure, driptrays must be positioned under all standing plants and machinery. Specialized spill kits must be stationed nearby for rapid fluid containment. Green Building and Dust Mitigation Regulations
Provision of gravel at site entrances to prevent dust pollution. During the inspection, officials verify that the physical
Name, designation, signature, and company stamp. How to Submit
Securing the COC 1 is non-negotiable. Without it, a project cannot transition to final utility connections, nor can it legally obtain an operational or occupancy permit. Key Stages of the Trakhees COC Process
Documentation proving responsible disposal of construction debris through authorized channels.